Several steps to check if the cuplock scaffolding qualified

(1) top cuplock scaffolding foundation must be strong, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures.


(2) must attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement.


(3) level is closed: we should step up, step every step or two, be put with cuplock scaffolding plank hand or foot basketry, cuplock scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security.


(4) the vertical closed: step from the second to fifth step, each step all needs to the stud unavoidably side set up in 1.00 m high protective railings and foot or set up a network, protective pole (net) with the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security;


In concentration areas or residents along the street, it should be the second step, the outside all set net set its safety or security.
(5) the erection of cuplock scaffolding steel, fasteners, cuplock scaffolding and connections shall not be arbitrarily dismantled. Construction when necessary, must be subject to consent by the site, head, and take effective measures to process is completed, immediately recover.


(6) the scaffold before use, should by the examination and acceptance of construction site, head of the organization, and present the single fill in the acceptance of rear can use. 