Cuplock Scaffolding News

  • Introduction of cuplock scaffolding auxiliary fittings

    The auxiliary member system is used for the working face and the wall drawing, etc., mainly include the following:Rail between (1) : to meet other ordinary steel scaffold board and wooden planks need

    2017/11/24
  • Introduction of main cuplock scaffolding fittings

    1) the standardThe vertical bar is the main stress bar of the scaffold, with a certain length of phi 448 x 3.5 and Q235 steel tube with a set of bowl fastening joints, and the top welding rod connecti

    2017/11/22
  • Safety management and maintenance of cuplock scaffold

    1. The construction load on the operating floor shall conform to the design requirements, and shall not be overloaded, and shall not be placed on the cuplock scaffold for materials such as templates a

    2017/11/17
  • About setting up cuplock scaffolding

    1. The base and pad should be accurately positioned on the positioning line; The pads should be used in length not less than 2, with a thickness of no less than 50mm. The base line should be perpendic

    2017/11/13
  • The preparations before setting up cuplock scaffolding

    1 The following supporting documents shall be provided for the cuplock scaffolding fittings.The main components shall have product identification and product quality certificate;The supplier shal

    2017/11/06
  • Key points of cuplock scaffold

    (1) the cuplock scaffolding shall consist of the upper cuplock, the lower cuplock, the crossbar joint and the upper cuplock clasp, and the joints shall be set at 0.6m modulus. (2) the main compon

    2017/11/01
  • Effect of the application of cuplock scaffolding

    The steel pipe scaffold cuplock consists of pole pole, horizontal bar and bowl buckle. The basic structure and the setting requirement are similar to the steel pipe scaffold, which is mainly in the jo

    2017/10/27
  • Safety technical requirements of the cuplock scaffold

    (1) scaffold construction organization shall be prepared before the scaffold is set up. Specify the use load, determine the scaffold plane, such as the layout drawing, list the component usage scale,